Infrastructure Project Updates

What’s Happening In Your Street

Armadillo Civil is completing watermain upgrades throughout Tauranga City and Western Bay.

These upgrades will:

  • Improve water delivery reliability (old pipes can leak / break)

  • Maintain consistent water pressure

  • Maintain water quality

  • Reduce water waste (old infrastructure can leak)

  • Support future growth in the area

Below is an update on the current watermain works around Tauranga.

Residents in affected streets will receive notifications in their letterboxes throughout the entire process.

Sutherland Road, Judea - TCC

We are about to begin Phase 4 – Shutdown & Commissioning

  • From 9pm Monday 23rd November – 4am Tuesday 24th November

This is when the switch over happens between the old watermain and the new watermain.

To do this, we have to shut down the water supply to your house for a short period while we switch you over to your new property connection.

How this may affect you:

·         Footpath closures in your area

·         Some temporary fencing will be removed, but some will remain in place at key access points in the network

Sutherland Ave, Mt Maunganui - TCC

We have completed Phase 5 – Reinstatement – The Final Phase!

Now that the new watermain is up and running, we have finished on your street.

We may have to shut off the water to some properties in the coming weeks as part of our testing on neighbouring streets. You will be advised directly if your property is going to be affected by this.

Lynwood Place and Highfield Crescent - TCC

We are about to begin Phase 2 – Construction.

Now that the new pipe is in place, we will begin connecting all the pipework under the ground and installing new fittings. We will be installing fire hydrants, valves and other fittings within the TCC berm. We will also install a new connection for your property to the new watermain.

How this may affect you:

·         Footpath closures in your area

·         Traffic Management between 7am-5pm Weekdays and occasional Saturdays

·         Digger and truck operations between 7am-5pm Weekdays and occasional Saturdays

·         Temporary fencing and / or cones will remain in place to secure any open holes / trenches

·         Your driveway will remain accessible for most of the project, however if we temporarily need to restrict access for a few hours our onsite crew will let you know a day or two beforehand

Estimated timeline for Phase 2 = 6 weeks

Oceanview Road / Tay Street / Valley Road, Mt Maunganui - TCC

We are currently working on Phase 1 - Drilling on Tay Street;

  • Between 16-30 Tay Street

  • Road crossing from 160 Oceanview Road to 30 Tay Street.

The new watermain will be installed via directional drilling along the council berm and footpath. We will endeavour to keep our footprint as small as possible and will maintain close communication with locals if their property is directly affected by the works.

How this may affect locals:

  • Footpath closures in your area

  • Active Traffic Management between 7am-5pm weekdays and occasional Saturdays

  • Inactive Traffic Management outside working hours

  • Digger, Drill & Truck operations between 7am-5pm weekdays and occasional Saturdays

  • Excavation of the Council Berm / Footpath – temporary fencing or cones will be used to secure any open holes / trenches

  • Residents’ driveways will remain accessible for most of the project, however if we temporarily need to restrict access for a few hours our onsite crew will let residents know at least 24-48 hours beforehand

  • Estimated timeline for Phase 1 = 3 Weeks

Our construction crew have also commenced Phase 2 – Fittings & Connections on Oceanview Road;

  • Between Sutherland Avenue and 19 Oceanview Road

  • Between Sutherland Avenue to Tay Street.

Now that the new pipe is in place, we will begin connecting all the pipework under the ground and installing new fittings. We will be installing fire hydrants, valves and other fittings within the TCC berm. We will also install a new connection for your property to the new watermain.

How this may affect you:

·         Footpath closures in your area

·         Traffic Management between 7am-5pm Weekdays and occasional Saturdays

·         Digger and truck operations between 7am-5pm Weekdays and occasional Saturdays

·         Temporary fencing and / or cones will remain in place to secure any open holes / trenches

·         Your driveway will remain accessible for most of the project, however if we temporarily need to restrict access for a few hours our onsite crew will let you know a day or two beforehand

·         Estimated timeline for Phase 2 = 6 weeks

Our water testing crew have commenced Stage 3 - Water Testing on Oceanview Road;

  • Between Sutherland Avenue, and 19 Oceanview Road.

Now that the new pipework is connected, we begin the crucial phase of testing the watermains to ensure the pipework is in working order and water quality is preserved. The pipework will be flushed and cleaned, and water will be sent for laboratory testing to ensure water safety.

How this may affect you:

·         Footpath closures in your area

·         Traffic Management between 7am-5pm Weekdays and occasional Saturdays

·         Water testing truck operations between 7am-5pm Weekdays and occasional Saturdays

·         Some temporary fencing will be removed, but some will remain in place at key access points in the network

·         Estimated timeline for Phase 3 = 2 weeks

Questions / Feedback?

If you have any questions, concerns, or feedback, please do not hesitate to get in touch — we are always happy to help.